Stone plastic elevator door pocket is a new mixed material composed of pvc+natural stone powder. The elevator pocket made of this material not only has the pattern and texture of marble, but also has good toughness and hardness. It can be said that it is a kind of door pocket material with very high cost performance. So, what is the construction process of the stone elevator door pocket?
石塑电梯门套
Stone plastic elevator door pocket
1、物料筹备:线条、侧板、泡棉胶、硅酮胶(或云石胶)、45°切割锯、台锯、胶枪、红外线仪器;
1. Material preparation: line, side panel, foam glue, silicone glue (or marble glue), 45 ° cutting saw, table saw, glue gun, infrared instrument;
2、布局墙体基面清算清洁外面没有油污、浮尘、并查验墙面平坦度和垂直度。超差部门应剔凿或用水泥沙浆修补缺点,加固找平,方能施工;
2. The base surface of the layout wall shall be cleared and cleaned without oil stain and floating dust, and the flatness and perpendicularity of the wall shall be checked. The out of tolerance department shall chisel or repair the defects with cement mortar, reinforce and level before construction;
3、在墙面找出水平线、垂直控制线;
3. Find out the horizontal line and vertical control line on the wall;
4、切割锯采纳45度角对线条切割并对角拼接反省平坦度厚板+线条形式:假如墙面是干挂大理石根基,需要用小木方在墙面上找3-4个点,而后用云石胶点粘,小木方周围用发泡胶添补;而后将切好45度切角的线条卡扣在侧板上,线条另一侧点粘到墙面上;薄板+线条形式:
4. The cutting saw adopts a 45 degree angle to cut the lines and make diagonal splicing to reflect on the flatness of the thick plate+line form: if the wall is a dry hanging marble foundation, you need to find 3-4 points on the wall with a small wooden square, and then stick them with marble glue, and use foam glue to fill around the small wooden square; Then snap the line with 45 ° chamfer on the side plate, and stick the point on the other side of the line to the wall; Sheet+line form:
假如墙面是干挂大理石根基,需要用细木工板打底,而后将薄板用泡棉胶暂时牢固,云石胶点粘到细木工板上;而后将薄板切割部门卡在线条卡槽中 ,将线条装置到位,压实,牢固在墙体细木工板基面上。卡槽一方面能够遮挡住侧板切割处的瑕疵,另一方面装置速率能够进步。(分外阐明:泡棉胶起到暂时牢固的感化,硅酮胶24小时内无奈凝结,但其前期感化力强,以是二者共同应用才能达到预期后果)
If the wall is dry hanging marble foundation, it needs to be bottomed with blockboard, and then the thin board is temporarily fixed with foam glue, and marble glue points are stuck to the blockboard; Then, clamp the thin plate cutting department in the line slot, put the line device in place, compact it, and firmly fix it on the base surface of the wall blockboard. On the one hand, the card slot can cover the defects at the cutting of the side panel, and on the other hand, the device speed can be improved. (It is particularly clarified that the foam adhesive has a temporary and firm effect, and the silicone adhesive cannot be coagulated within 24 hours, but its early effect is strong, so the expected consequences can be achieved only when both are used together.)
7、将对角处裂缝打硅酮胶填满抹
7. Fill the diagonal cracks with silicone glue
8、将线条与墙的间隙打胶抹
8. Glue the gap between the line and the wall
9、侧板依据现实尺寸用台锯切割,施工方法请参照线条(根基平坦,泡棉胶暂时牢固,硅酮胶点粘
9. The side plate shall be cut with a bench saw according to the actual size. For the construction method, please refer to the line (the foundation is flat, the foam glue is temporarily firm, and the silicone glue is stuck
以上就是为大家介绍的有关人工湖设计的详细的介绍,希望对您有所帮助.如果您有什么疑问的话,欢迎联系我们.我们将以的态度,为您提供服务http://www.sddtmt.com
The above is a detailed introduction to the design of the artificial lake. I hope it will be helpful to you. If you have any questions, please contact us. We will provide services for you with our attitude http://www.sddtmt.com
下一篇:电梯门套与电梯门套花色的关系上一篇:不锈钢玻璃门的选购方法